Pumping station, Lock Born

In and around the pump pumping station lock Born is the piping of the pumping station replaced. As a result, it was necessary to place a temporary pump installation as backup.

Due to renovations at the lock in Born, Vanderkamp Pumps has installed a temporary pump installation with a total capacity of 6 m3/s = 21.600 m3/hour. The discharge consisted of 3 pipelines ø800-1000 with a lenght of ca. 500 meter, which included a large road crossing.

Services
Rent
Type of project
Surface water
Branch
Building infrastructure
Client
Mourik Limburg B.V.
Year
2016
Country
Netherlands
Location
Born

Watch the video:

Share this on: