For this project we had the opportunity to deliver 3 temporary boosterpumps (137 kW, 60 Hz each), including piping and engineering.These pumps supplied the cooling water for the FPU during transport on the Vanguard. The boosterpumps, being installed at decklevel on board of the Vanguard, had to be able to be submerged up to 12 meter during the loading and unloading process of the FPU.
Read about the background, the challenges, the Vanderkamp solution and the outcome of this project.
"Vanderkamp pumps are building a solid reputation in the UK - not only for their tailor-made pump and pipework supplies, but also for their quality cutting-edge engineering designs."