Cooling water on the Vanguard

   

For this project we had the opportunity to deliver 3 temporary boosterpumps (137 kW, 60 Hz each), including piping and engineering.These pumps supplied the cooling water for the FPU during transport on the Vanguard. The boosterpumps, being installed at decklevel on board of the Vanguard, had to be able to be submerged up to 12 meter during the loading and unloading process of the FPU.

Services
Rent
Type of project
Surface water
Branch
Offshore
Client
Dockwise
Year
2016
Country
Korea
Location
Ulsan
External website

Watch the video:

Share this on:

Recent news

Project in de UK: Thames Water Coppermills Treatment Works

17 June 2022

Read about the background, the challenges, the Vanderkamp solution and the outcome of this project.

Editorial Water Industry Journal: To the next level

14 December 2021

"Vanderkamp pumps are building a solid reputation in the UK - not only for their tailor-made pump and pipework supplies, but also for their quality cutting-edge engineering designs."