Lock Eefde 2015

Due to renovation of the pumping station at lock Eefde, we build up a temporary pumping installation that was used for a period of more than 6 months. Capacity of 40.000 m3/hour.

In connection with the renovation of the lock complex at Eefde, we installed a temporary pump installation with a capacity of almost 40,000 m3 per hour with a discharge height of 8 meters.

The project was part of a UAV / GC contract (design & construct by system enginering) carried out by Cofely Zuid-Nederland on behalf of Rijkswaterstaat.

The temporary pump installation experienced a number of special challenges.

For example, the available space for the installation of the equipment was limited and at high water the pump installation could be flooded. Part of the piping had to cross the road without hindering traffic.

Because there was electrical power at work, no generators were needed.

However, this diet was limited so that high demands were placed on the design.

The operation of the entire installation was finally carried out in such a way that it could be operated from the 24-hour power station at Cofely in Maastricht.

In summary:

  • A pump installation of 40,000 m3 per hour with a discharge height of 8 meters
  • 5 pipes with a diameter of 800 mm including road overvoltage
  • 5 Flygt 3800 pumps
  • An installed capacity of 2250 Kilowatts
  • The entire installation can be operated remotely.

In 2018 we were again at this location: Lock Eefde 2018.

Services
Rent, Design and construct
Type of project
Surface water
Branch
Gouvernement
Client
Cofely Zuid Nederland
Year
2015
Country
Netherlands
Location
Eefde

Watch the video:

Share this on:

Recent news

Moving up to the next level

13 August 2020

Moving up to the next level
And that goes fast