Sewage pumping station Deventer

Temporary pump quickly operational

In December, commissioned by the municipality of Deventer, we installed a temporary pump in the sewage pumping station on the Roessinkspad.
One of the existing pumps was in need of urgent repair, it was just before Christmas and time was running out.

With a flow rate of 460 m3/hour and a head of 6.5 metres water column not our largest installation, but certainly not unimportant given its location in the middle of a residential area.
In one day we were able to install, connect and adjust the pump to the existing frequency controller.
In this way, from December 2019 to March 2020, the people of Deventer did not have any problems with the drainage of the sewage water.

Services
Rent
Type of project
Wastewater
Branch
Gouvernement
Client
Gemeente Deventer
Year
2019
Country
Netherlands
Location
Deventer

Share this on:

Recent news

Moving up to the next level

13 August 2020

Moving up to the next level
And that goes fast

Pumping leaking water weir Linne

28 April 2020

"After a short but efficient design process we are in the starting blocks to start today, Tuesday 28 April, with the installation of two pump installations.

Solar panels

09 April 2020

With the installation of 356 solar panels on the roof of our new workshop at the beginning of April, we were able to make another important step in making our facility in Zwolle energy-neutral.