Terneuzen

Creating land at the new lock in Terneuzen

Land is being created at the new lock in Terneuzen in the Netherlands. A large amount of sand was recovered for the construction of the 427 m long, 55 m wide and 16.44 m deep lock. We have supplied a pump set for DEME to return the return water of the hopper and suction dredger to the Westerschelde with a quantity of 12,000 m3 / hours, fully autonomous, automatic and level controlled.

Services
Rent
Type of project
Surface water
Branch
Industry
Client
DEME
Year
2019
Country
Netherlands
Location
Terneuzen

Watch the video:

Share this on:

Recent news

Project in the Waddenzee

08 November 2017

A Flygt 3501 is suspended from an excavator from a pontoon in the Wadden Sea, used to spray a pipe.

Project in Fareham, near Southhampton

22 September 2017

In Fareham, near Southampton (UK) we are carrying out this great and interesting project.