Two temporary pump installations and a grid ware installation.

What started as a phone call on Saturday morning from GW-Leidingtechniek resulted in an early Sunday morning in which we stood with 4 trailers material, a telescope crane, and 3 mechanic at RWZI Zwaanshoek.

GW-Leidingtechniek has a calamity contract on behalf of Hoogheemraadschap van Rijnland. In this calamity, GWL quickly realized that the use of a temporary pumping installation (TPI) was necessary and that is why we left directly to RWZI Zwaanshoek as a permanent partner. Upon arrival, it was found that a tube had been hit on the rwzi site, there was overpressure in the tube, which flooded the entire site of the RWZI. On location, we looked at the possibilities for the use of a TPI. In Zwolle they started preparing and loading the necessary materials.

The TPI was set up within a few days, which was later expanded with a mobile fine screen installation and a second pump set for pumping back primary sludge.

The entire installation was characterized by:

  • A continuously adjustable pump installation for the influent with a capacity of 6500 m3 / hour
  • Two temporary fine screen installation with a total maximum capacity of approximately 7000 m3 / hour
  • A continuously adjustable pump installation for the return sludge with a capacity of 3200 m3 / hour
  • Common discharge evenly distributed in the distribution work
  • 1x emergency spill directly in BLT

 

IG/2019

Services
Rent
Type of project
Wastewater
Branch
Gouvernement
Client
GW Leidingtechniek
Year
2018
Country
Netherlands
Location
Zwaanshoek